Plan Development

CTPG Base Cases

Instructions for Requesting/Obtaining CTPG Base Cases

Study Schedules

Revised Phase 4 Schedule (as of November 19, 2010)

 

Date Study Plans & Reports
March 5, 2012 2011 Final Statewide Transmission Plan (PDF)
January 10, 2012 2011 Draft Statewide Transmission Plan (PDF)
December 21, 2011 2011 Final Phase 2 Study Report (PDF)
December 9, 2011 2011 State-Wide Transmission Plan Approach (PDF)
November 1, 2011 2011 CTPG Study Assumptions (PDF)
October 26, 2011 2011 Draft Phase 2 Study Report (PDF)
September 20, 2011

2011 Final Study Plan (PDF)
SMUD Minimum Generation Requirement (PDF)
MID Minimum Generation Requirement (PDF)
TID Minimum Generation Requirement (PDF)
- San Diego Generation Constraint (PDF) (Updated 8/11/11)
Generation Decrement Spreadsheet (XLS)

July 29, 2011 2011 Study Plan, Draft 2 (PDF)
SMUD Minimum Generation Requirement (PDF)
MID Minimum Generation Requirement (PDF)
TID Minimum Generation Requirement (PDF)
San Diego Generation Constraint (PDF) (Updated 8/11/11)
Generation Decrement Spreadsheet (XLS) 
July 15, 2011

2011 Draft Study Plan (PDF)
SMUD Minimum Generation Requirement (PDF)
MID Minimum Generation Requirement (PDF)
TID Minimum Generation Requirement (PDF)
- San Diego Generation Constraint (PDF) (Updated 8/11/11)
Generation Decrement Spreadsheet (XLS)

April 29, 2011 CTPG 2011 Phase 1 Work Plan (April 29, 2011)
February 9, 2011 Final Statewide Transmission Plan (February 9, 2011)
February 2, 2011 Final Draft Statewide Transmission Plan (February 2, 2011)
February 2, 2011 Final Draft Phase 4 Study Report (February 2, 2011)
January 4, 2011 Draft Statewide Transmission Plan (January 4, 2011)

 

2010 and earlier postings can be found in the Archived Documents page.